Social Links Search User Login Menu
Tools
Close
Close
Overhead Sign Installation at I-5/French Camp Road
Caravan News 5078

Overhead Sign Installation at I-5/French Camp Road

To accommodate work required for reconstruction of the Interstate 5/French Camp Road Interchange, the following closures will be in place beginning this Thursday night, May 15, 2014:

Northbound

  • One lane on northbound Interstate 5 between one-half mile south of French Camp off-ramp and one-half mile north of French Camp on-ramp from 8:00 p.m. until 6:00 a.m.
  • Two lanes on northbound Interstate 5 between one-half mile south of French Camp off-ramp and one-half mile north of French Camp on-ramp from 12:00 a.m. until 5:00 a.m.

  • The northbound off-ramp from Interstate 5 to French Camp Road from 9:00 p.m. until 6:00 a.m.

  • The northbound on-ramp from French Camp Road to Interstate 5 from 9:00 p.m. until 6:00 a.m.


This work is scheduled to begin as listed, but is subject to change due to traffic incidents, weather, availability of equipment and/or materials and construction-related issues.

For the safety of workers and other motorists, please Slow for the Cone Zone.

Rate article

No rating
Rate this article:
No rating

Share

Print

grant express

Back To Top